CDCS502PERF-EVM

Mfr. #: CDCS502PERF-EVM
制造商: Texas Instruments
描述: EVAL PERFORMANCE MOD FOR CDCS502
生命周期: 制造商新产品。
数据表: CDCS502PERF-EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCS502PERF-EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Clock Generators Bulk is the packaging method for this product This product's 8 MHz to 108 MHz range is 0Hz to 2.2GHz. The Timing, Clock Generator is the Main-Purpose. Primary-Attributes: - IC package type: CDCS502 Minimum operating temperature: - 30 C This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the CDCS502. USB interface type

CDCS502PERF-EVM Image

CDCS502PERF-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCS502PERF-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Clock Generators
  • Packaging Bulk
  • Frequency 8 MHz to 108 MHz
  • Main-Purpose Timing, Clock Generator
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part CDCS502
  • Minimum-Operating-Temperature - 30 C
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of CDCS502
  • Interface-Type USB

CDCS502PERF-EVM

CDCS502PERF-EVM Specifications

CDCS502PERF-EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Clock Generators.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 8 MHz to 108 MHz.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, Clock Generator.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is CDCS502.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 30 C.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed CDCS502

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$148.50
US$148.50
10
US$141.08
US$1 410.75
100
US$133.65
US$13 365.00
500
US$126.22
US$63 112.50
1000
US$118.80
US$118 800.00
Top