DAC3152EVM

Mfr. #: DAC3152EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR DAC3152
生命周期: 制造商新产品。
数据表: DAC3152EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC3152EVM Overview

Product belongs to the DAC3152 series. This product is categorized as Evaluation Boards Type: DAC This product operates at a 5 V to 7 V supply voltage for reliable performance. This tool is designed for the DAC3152.

DAC3152EVM Image

DAC3152EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC3152EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series DAC3152
  • Product Evaluation Boards
  • Type DAC
  • Operating-Supply-Voltage 5 V to 7 V
  • Tool-Is-For-Evaluation-Of DAC3152

DAC3152EVM

DAC3152EVM Specifications

DAC3152EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed DAC3152

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V to 7 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC3152

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$230.43
US$230.43
10
US$218.91
US$2 189.08
100
US$207.39
US$20 738.70
500
US$195.87
US$97 932.75
1000
US$184.34
US$184 344.00
Top