DAC5672EVM

Mfr. #: DAC5672EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR DAC5672
生命周期: 制造商新产品。
数据表: DAC5672EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC5672EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This tool is designed for the DAC5672. I2C SMA interface type

DAC5672EVM Image

DAC5672EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5672EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Tool-Is-For-Evaluation-Of DAC5672
  • Interface-Type I2C SMA

DAC5672EVM

DAC5672EVM Specifications

DAC5672EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC5672.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$223.50
US$223.50
10
US$212.32
US$2 123.25
100
US$201.15
US$20 115.00
500
US$189.98
US$94 987.50
1000
US$178.80
US$178 800.00
Top