DAC7741EVM

Mfr. #: DAC7741EVM
制造商: Texas Instruments
描述: EVAL MOD FOR DAC7741
生命周期: 制造商新产品。
数据表: DAC7741EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC7741EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 10 V to 15 V supply voltage for reliable performance. This tool is designed for the DAC7741.

DAC7741EVM Image

DAC7741EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC7741EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 10 V to 15 V
  • Tool-Is-For-Evaluation-Of DAC7741

DAC7741EVM

DAC7741EVM Specifications

DAC7741EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 10 V to 15 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DAC7741.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$154.20
US$154.20
10
US$146.49
US$1 464.90
100
US$138.78
US$13 878.00
500
US$131.07
US$65 535.00
1000
US$123.36
US$123 360.00
Top