DAC8411EVM

Mfr. #: DAC8411EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR DAC8411
生命周期: 制造商新产品。
数据表: DAC8411EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8411EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 1.8 V to 5.5 V supply voltage for reliable performance. This tool is designed for the DAC8411. SPI interface type

DAC8411EVM Image

DAC8411EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8411EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 1.8 V to 5.5 V
  • Tool-Is-For-Evaluation-Of DAC8411
  • Interface-Type SPI

DAC8411EVM

DAC8411EVM Specifications

DAC8411EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V to 5.5 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DAC8411.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$56.74
US$56.74
10
US$53.91
US$539.08
100
US$51.07
US$5 107.05
500
US$48.23
US$24 116.65
1000
US$45.40
US$45 396.00
Top