DAC8551EVM

Mfr. #: DAC8551EVM
制造商: Texas Instruments
描述: EVALUATION MODULE FOR DAC8551
生命周期: 制造商新产品。
数据表: DAC8551EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8551EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8551. SPI interface type

DAC8551EVM Image

DAC8551EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8551EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8551
  • Interface-Type SPI

DAC8551EVM

DAC8551EVM Specifications

DAC8551EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC8551.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00