| Mfr. #: | DRV110EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | EVAL MODULE FOR DRV110 |
| 生命周期: | 制造商新产品。 |
| 数据表: | DRV110EVM 数据表 |


Product belongs to the DRV110 series. This product is categorized as Evaluation Modules Type: Current Mode PWM Controllers Bulk is the packaging method for this product This product is designed DRV110 DRV120 amplifier. The Power Management, Solenoid Control is the Main-Purpose. Primary-Attributes: - IC package type: DRV110 Maximum operating temperature of + 35 C Minimum operating temperature: - 40 C This product is an DRV110A 14-pin TSSOP. This tool is designed for the DRV110 DRV120. Input Voltage Range: 7 V to 48 V 100 V to 240 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV110EVM Specifications
A: At what frequency does the Series?
Q: The product Series is DRV110.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Current Mode PWM Controllers
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: Is the cutoff frequency of the product For-Use-With?
Q: Yes, the product's For-Use-With is indeed DRV110 DRV120
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Power Management, Solenoid Control.
A: At what frequency does the Primary-Attributes?
Q: The product Primary-Attributes is -.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is DRV110.
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 35 C.
A: At what frequency does the Minimum-Operating-Temperature?
Q: The product Minimum-Operating-Temperature is - 40 C.
A: What is the Description-Function of the product?
Q: The Description-Function of the product is DRV110A 14-pin TSSOP.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is DRV110 DRV120.
A: At what frequency does the Input-Voltage?
Q: The product Input-Voltage is 7 V to 48 V 100 V to 240 V.