| Mfr. #: | DRV201EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | EVAL MODULE FOR DRV201 |
| 生命周期: | 制造商新产品。 |
| 数据表: | DRV201EVM 数据表 |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Voice Coil Motor Driver for Camera Auto Focus IC package type: DRV201 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C Output voltage: - This tool is designed for the DRV201. I2C interface type Input Voltage Range: 2.5 V to 4.8 V Output current: 102.3 mA

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV201EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers
A: Is the cutoff frequency of the product Main-Purpose?
Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control
A: Is the cutoff frequency of the product Primary-Attributes?
Q: Yes, the product's Primary-Attributes is indeed Voice Coil Motor Driver for Camera Auto Focus
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is DRV201.
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 85 C.
A: What is the Minimum-Operating-Temperature of the product?
Q: The Minimum-Operating-Temperature of the product is - 40 C.
A: Is the cutoff frequency of the product Output-Voltage?
Q: Yes, the product's Output-Voltage is indeed -
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is DRV201.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is I2C.
A: What is the Input-Voltage of the product?
Q: The Input-Voltage of the product is 2.5 V to 4.8 V.
A: At what frequency does the Output-Current?
Q: The product Output-Current is 102.3 mA.