DRV3201EVM

Mfr. #: DRV3201EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR DRV3201
生命周期: 制造商新产品。
数据表: DRV3201EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV3201EVM Overview

Product belongs to the DRV3201 series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: - IC package type: DRV3201 Output voltage: 3.3 V 5 V This product is an Evaluates the operation and performance of the DRV3201-Q1 bridge driver. This tool is designed for the DRV3201-Q1. CAN JTAG LIN SPI USB interface type Input Voltage Range: 4.75 V to 30 V Output current: 400 mA 2.5 A

DRV3201EVM Image

DRV3201EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV3201EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV3201
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part DRV3201
  • Output-Voltage 3.3 V 5 V
  • Description-Function Evaluates the operation and performance of the DRV3201-Q1 bridge driver
  • Tool-Is-For-Evaluation-Of DRV3201-Q1
  • Interface-Type CAN JTAG LIN SPI USB
  • Input-Voltage 4.75 V to 30 V
  • Output-Current 400 mA 2.5 A

DRV3201EVM

DRV3201EVM Specifications

DRV3201EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed DRV3201

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV3201.

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 3.3 V 5 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Evaluates the operation and performance of the DRV3201-Q1 bridge driver.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV3201-Q1

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is CAN JTAG LIN SPI USB.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 4.75 V to 30 V.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 400 mA 2.5 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$774.93
US$774.93
10
US$736.18
US$7 361.84
100
US$697.44
US$69 743.70
500
US$658.69
US$329 345.25
1000
US$619.94
US$619 944.00
Top