DRV3204EVM

Mfr. #: DRV3204EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR DRV3204
生命周期: 制造商新产品。
数据表: DRV3204EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV3204EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers This product is designed DRV3204-Q1 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: 3-Ph Brushless DC (BLDC) Motors IC package type: DRV3204 This product is an An application board to evaluate the DRV3204-Q1. This tool is designed for the DRV3204-Q1. SPI interface type Input Voltage Range: 12 V Output current: 10 A

DRV3204EVM Image

DRV3204EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV3204EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • For-Use-With DRV3204-Q1
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes 3-Ph Brushless DC (BLDC) Motors
  • Embedded -
  • Utilized-IC-Part DRV3204
  • Description-Function An application board to evaluate the DRV3204-Q1
  • Tool-Is-For-Evaluation-Of DRV3204-Q1
  • Interface-Type SPI
  • Input-Voltage 12 V
  • Output-Current 10 A

DRV3204EVM

DRV3204EVM Specifications

DRV3204EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is DRV3204-Q1.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Motor Control.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 3-Ph Brushless DC (BLDC) Motors.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV3204.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is An application board to evaluate the DRV3204-Q1.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV3204-Q1.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 12 V.

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 10 A

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$1.00
US$1.00
10
US$957.47
US$9 574.72
100
US$907.08
US$90 707.85
500
US$856.69
US$428 342.65
1000
US$806.29
US$806 292.00
Top