DRV591EVM

Mfr. #: DRV591EVM
制造商: Texas Instruments
描述: EVAL MOD FOR DRV591
生命周期: 制造商新产品。
数据表: DRV591EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV591EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Gate Drivers Bulk is the packaging method for this product The Power Management, Half H-Bridge Driver (Internal FET) is the Main-Purpose. Primary-Attributes: +/-3A, 2.8 ~ 5.5V, Driver for Thermoelectric Cooler (TEC) or Laser Diode IC package type: DRV591 This tool is designed for the DRV591VFP. Input Voltage Range: 2.8 V to 5.5 V

DRV591EVM Image

DRV591EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV591EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Gate Drivers
  • Packaging Bulk
  • Main-Purpose Power Management, Half H-Bridge Driver (Internal FET)
  • Primary-Attributes +/-3A, 2.8 ~ 5.5V, Driver for Thermoelectric Cooler (TEC) or Laser Diode
  • Embedded No
  • Utilized-IC-Part DRV591
  • Tool-Is-For-Evaluation-Of DRV591VFP
  • Input-Voltage 2.8 V to 5.5 V

DRV591EVM

DRV591EVM Specifications

DRV591EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Gate Drivers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Half H-Bridge Driver (Internal FET)

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is +/-3A, 2.8 ~ 5.5V, Driver for Thermoelectric Cooler (TEC) or Laser Diode.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV591

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV591VFP

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 2.8 V to 5.5 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$19.04
US$19.04
10
US$18.08
US$180.83
100
US$17.13
US$1 713.15
500
US$16.18
US$8 089.90
1000
US$15.23
US$15 228.00
Top