| Mfr. #: | DRV601EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | EVAL MODULE FOR DRV601 |
| 生命周期: | 制造商新产品。 |
| 数据表: | DRV601EVM 数据表 |


Product belongs to the DirectPath series. Type: Audio Amplifiers Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 1.8 V ~ 4.5 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV601 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV601.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV601EVM Specifications
A: At what frequency does the Series?
Q: The product Series is DirectPath.
A: At what frequency does the Type?
Q: The product Type is Audio Amplifiers.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: What is the Output-Type of the product?
Q: The Output-Type of the product is 2-Channel (Stereo).
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 1.8 V ~ 4.5 V.
A: Is the cutoff frequency of the product Max-Output-Power-x-Channels-Load?
Q: Yes, the product's Max-Output-Power-x-Channels-Load is indeed -
A: Is the cutoff frequency of the product Amplifier-Type?
Q: Yes, the product's Amplifier-Type is indeed Class AB
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is DRV601.
A: What is the Board-Type of the product?
Q: The Board-Type of the product is Fully Populated.
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 3.3 V.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is DRV601.