| Mfr. #: | DRV602EVM2 |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | EVAL MODULE FOR DRV602 |
| 生命周期: | 制造商新产品。 |
| 数据表: | DRV602EVM2 数据表 |


Product belongs to the DirectPath series. Type: Audio Amplifiers Output-Type: 2-Channel (Stereo) Voltage Supply Range: 3 V ~ 5.5 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV602 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV602.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV602EVM2 Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed DirectPath
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Audio Amplifiers
A: At what frequency does the Output-Type?
Q: The product Output-Type is 2-Channel (Stereo).
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 3 V ~ 5.5 V.
A: What is the Max-Output-Power-x-Channels-Load of the product?
Q: The Max-Output-Power-x-Channels-Load of the product is -.
A: What is the Amplifier-Type of the product?
Q: The Amplifier-Type of the product is Class AB.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is DRV602.
A: Is the cutoff frequency of the product Board-Type?
Q: Yes, the product's Board-Type is indeed Fully Populated
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 3.3 V.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is DRV602.