DRV8307EVM

Mfr. #: DRV8307EVM
制造商: Texas Instruments
描述: EVAL BOARD MOTOR DRIVER DRV8307
生命周期: 制造商新产品。
数据表: DRV8307EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8307EVM Overview

Product belongs to the DRV8307 series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed DRV8307 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Brushless DC (BLDC) Motors IC package type: DRV8307 Output voltage: 5 V This product is an Solution for evaluating the DRV8307 a brushless DC motor controller. This tool is designed for the DRV8307. Input Voltage Range: 8.5 V Output current: 30 mA

DRV8307EVM Image

DRV8307EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8307EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV8307
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With DRV8307
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Brushless DC (BLDC) Motors
  • Embedded -
  • Utilized-IC-Part DRV8307
  • Output-Voltage 5 V
  • Description-Function Solution for evaluating the DRV8307 a brushless DC motor controller
  • Tool-Is-For-Evaluation-Of DRV8307
  • Input-Voltage 8.5 V
  • Output-Current 30 mA

DRV8307EVM

DRV8307EVM Specifications

DRV8307EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is DRV8307.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is DRV8307.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Brushless DC (BLDC) Motors

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV8307.

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 5 V

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Solution for evaluating the DRV8307 a brushless DC motor controller

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8307

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 8.5 V.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 30 mA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$86.85
US$86.85
10
US$82.51
US$825.08
100
US$78.16
US$7 816.50
500
US$73.82
US$36 911.25
1000
US$69.48
US$69 480.00
Top