| Mfr. #: | DRV8701EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | EVALUATION MOD DRV8701 |
| 生命周期: | 制造商新产品。 |
| 数据表: | DRV8701EVM 数据表 |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed MSP430G2553 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Single-H-Bridge Driver IC package type: DRV8701 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product is an Full bridge brushed DC motor gate driver evaluation module. This tool is designed for the DRV8701. USB interface type Input Voltage Range: 5.9 V to 45 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8701EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: What is the Type of the product?
Q: The Type of the product is Motor / Motion Controllers & Drivers.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: What is the For-Use-With of the product?
Q: The For-Use-With of the product is MSP430G2553.
A: Is the cutoff frequency of the product Main-Purpose?
Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control
A: At what frequency does the Primary-Attributes?
Q: The product Primary-Attributes is Single-H-Bridge Driver.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is DRV8701.
A: At what frequency does the Maximum-Operating-Temperature?
Q: The product Maximum-Operating-Temperature is + 125 C.
A: Is the cutoff frequency of the product Minimum-Operating-Temperature?
Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C
A: At what frequency does the Description-Function?
Q: The product Description-Function is Full bridge brushed DC motor gate driver evaluation module.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is DRV8701.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is USB.
A: What is the Input-Voltage of the product?
Q: The Input-Voltage of the product is 5.9 V to 45 V.