DRV8704EVM

Mfr. #: DRV8704EVM
制造商: Texas Instruments
描述: EVAL BOARD FOR DRV8704
生命周期: 制造商新产品。
数据表: DRV8704EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8704EVM Overview

This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers This product is an Dual brushed DC motor gate driver evaluation module. This tool is designed for the DRV8704. SPI interface type Input Voltage Range: 8 V to 52 V

DRV8704EVM Image

DRV8704EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8704EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Description-Function Dual brushed DC motor gate driver evaluation module
  • Tool-Is-For-Evaluation-Of DRV8704
  • Interface-Type SPI
  • Input-Voltage 8 V to 52 V

DRV8704EVM

DRV8704EVM Specifications

DRV8704EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Dual brushed DC motor gate driver evaluation module

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV8704.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 8 V to 52 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top