DRV8803EVM

Mfr. #: DRV8803EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR DRV8803
生命周期: 制造商新产品。
数据表: DRV8803EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8803EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: 1.5A @ 1 Channel, 800mA @ 4 Channels IC package type: DRV8803 Maximum operating temperature of + 85 C This tool is designed for the DRV8803. USB interface type

DRV8803EVM Image

DRV8803EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8803EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Main-Purpose Power Management, Motor Control, Stepper
  • Primary-Attributes 1.5A @ 1 Channel, 800mA @ 4 Channels
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8803
  • Maximum-Operating-Temperature + 85 C
  • Tool-Is-For-Evaluation-Of DRV8803
  • Interface-Type USB

DRV8803EVM

DRV8803EVM Specifications

DRV8803EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control, Stepper

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 1.5A @ 1 Channel, 800mA @ 4 Channels.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV8803.

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 85 C.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8803

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$148.50
US$148.50
10
US$141.08
US$1 410.75
100
US$133.65
US$13 365.00
500
US$126.22
US$63 112.50
1000
US$118.80
US$118 800.00
Top