DRV8823EVM

Mfr. #: DRV8823EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR DRV8823
生命周期: 制造商新产品。
数据表: DRV8823EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8823EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Bulk is the packaging method for this product The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: - IC package type: DRV8823 This product is an Evaluation Module. This tool is designed for the DRV8823.

DRV8823EVM Image

DRV8823EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8823EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Kits
  • Packaging Bulk
  • Main-Purpose Power Management, Motor Control, Stepper
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part DRV8823
  • Description-Function Evaluation Module
  • Tool-Is-For-Evaluation-Of DRV8823

DRV8823EVM

DRV8823EVM Specifications

DRV8823EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control, Stepper.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV8823.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Evaluation Module.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV8823.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$28.64
US$28.64
10
US$27.20
US$272.03
100
US$25.77
US$2 577.15
500
US$24.34
US$12 169.90
1000
US$22.91
US$22 908.00
Top