DRV8824EVM

Mfr. #: DRV8824EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR DRV8824
生命周期: 制造商新产品。
数据表: DRV8824EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8824EVM Overview

Product belongs to the - series. This product is categorized as Development Tools Bulk is the packaging method for this product The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: - IC package type: DRV8824 This product is an Evaluation Module. This tool is designed for the DRV8824.

DRV8824EVM Image

DRV8824EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8824EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Development Tools
  • Packaging Bulk
  • Main-Purpose Power Management, Motor Control, Stepper
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part DRV8824
  • Description-Function Evaluation Module
  • Tool-Is-For-Evaluation-Of DRV8824

DRV8824EVM

DRV8824EVM Specifications

DRV8824EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Development Tools

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Motor Control, Stepper.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV8824.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Evaluation Module.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV8824.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$172.52
US$172.52
10
US$163.89
US$1 638.89
100
US$155.26
US$15 526.35
500
US$146.64
US$73 318.90
1000
US$138.01
US$138 012.00
Top