DRV8830EVM

Mfr. #: DRV8830EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR DRV8830
生命周期: 制造商新产品。
数据表: DRV8830EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8830EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Power Management Specialized The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Single-H-Bridge Driver, 1A IC package type: DRV8830 This tool is designed for the DRV8830. I2C interface type Output current: 1 A

DRV8830EVM Image

DRV8830EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8830EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Power Management Specialized
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Single-H-Bridge Driver, 1A
  • Embedded No
  • Utilized-IC-Part DRV8830
  • Tool-Is-For-Evaluation-Of DRV8830
  • Interface-Type I2C
  • Output-Current 1 A

DRV8830EVM

DRV8830EVM Specifications

DRV8830EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Power Management Specialized.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Single-H-Bridge Driver, 1A.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV8830

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV8830.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 1 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$56.74
US$56.74
10
US$53.91
US$539.08
100
US$51.07
US$5 107.05
500
US$48.23
US$24 116.65
1000
US$45.40
US$45 396.00
Top