DRV8836EVM

Mfr. #: DRV8836EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR DRV8836
生命周期: 制造商新产品。
数据表: DRV8836EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8836EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: 2 Channel H-Bridge Driver IC package type: DRV8836 This tool is designed for the DRV8836. Input Voltage Range: 2 V to 11 V

DRV8836EVM Image

DRV8836EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8836EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes 2 Channel H-Bridge Driver
  • Embedded No
  • Utilized-IC-Part DRV8836
  • Tool-Is-For-Evaluation-Of DRV8836
  • Input-Voltage 2 V to 11 V

DRV8836EVM

DRV8836EVM Specifications

DRV8836EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 2 Channel H-Bridge Driver.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV8836

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8836

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 2 V to 11 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$56.74
US$56.74
10
US$53.91
US$539.08
100
US$51.07
US$5 107.05
500
US$48.23
US$24 116.65
1000
US$45.40
US$45 396.00
Top