DRV8837EVM

Mfr. #: DRV8837EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR DRV8837
生命周期: 制造商新产品。
数据表: DRV8837EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8837EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Single-H-Bridge Driver IC package type: DRV8837 This tool is designed for the DRV8837. Input Voltage Range: 1.8 V to 11 V Output current: 1.8 A

DRV8837EVM Image

DRV8837EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8837EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Single-H-Bridge Driver
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8837
  • Tool-Is-For-Evaluation-Of DRV8837
  • Input-Voltage 1.8 V to 11 V
  • Output-Current 1.8 A

DRV8837EVM

DRV8837EVM Specifications

DRV8837EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is Single-H-Bridge Driver.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV8837.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8837

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 1.8 V to 11 V.

  • A: What is the Output-Current of the product?

    Q: The Output-Current of the product is 1.8 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$37.50
US$37.50
10
US$35.62
US$356.25
100
US$33.75
US$3 375.00
500
US$31.88
US$15 937.50
1000
US$30.00
US$30 000.00
Top