| Mfr. #: | DRV8839EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | EVAL BOARD FOR DRV8839 |
| 生命周期: | 制造商新产品。 |
| 数据表: | DRV8839EVM 数据表 |


Product belongs to the DRV8839 series. This product is categorized as Evaluation Modules Type: Gate Drivers Bulk is the packaging method for this product This product is designed DRV8839 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Brush DC Motors IC package type: DRV8839 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product is an Complete solution for evaluating the low voltage brushed DC motor driver. This tool is designed for the DRV8839. USB interface type Input Voltage Range: 3.3 V Output current: 1.8 A

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8839EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed DRV8839
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is Gate Drivers.
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: What is the For-Use-With of the product?
Q: The For-Use-With of the product is DRV8839.
A: At what frequency does the Main-Purpose?
Q: The product Main-Purpose is Power Management, Motor Control.
A: Is the cutoff frequency of the product Primary-Attributes?
Q: Yes, the product's Primary-Attributes is indeed Brush DC Motors
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed DRV8839
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 85 C.
A: At what frequency does the Minimum-Operating-Temperature?
Q: The product Minimum-Operating-Temperature is - 40 C.
A: At what frequency does the Description-Function?
Q: The product Description-Function is Complete solution for evaluating the low voltage brushed DC motor driver.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is DRV8839.
A: Is the cutoff frequency of the product Interface-Type?
Q: Yes, the product's Interface-Type is indeed USB
A: What is the Input-Voltage of the product?
Q: The Input-Voltage of the product is 3.3 V.
A: Is the cutoff frequency of the product Output-Current?
Q: Yes, the product's Output-Current is indeed 1.8 A