FDC2214EVM

Mfr. #: FDC2214EVM
制造商: Texas Instruments
描述: EVAL BOARD FOR FDC2214
生命周期: 制造商新产品。
数据表: FDC2214EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
FDC2214EVM Overview

Product belongs to the - series. This product is categorized as Demonstration Boards Type: Capacitive Touch Sensors Bulk is the packaging method for this product Sensitivity: - Interface: I2C Voltage Supply Range: 2.7 V ~ 3.6 V Touch, Capacitive Sensing range of 2 Buttons/Keys Included item: Board. IC package type: FDC2214 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the FDC2214.

FDC2214EVM Image

FDC2214EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

FDC2214EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Demonstration Boards
  • Type Capacitive Touch Sensors
  • Packaging Bulk
  • Sensitivity -
  • Interface I2C
  • Voltage-Supply 2.7 V ~ 3.6 V
  • Sensor-Type Touch, Capacitive
  • Sensing-Range 2 Buttons/Keys
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part FDC2214
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of FDC2214

FDC2214EVM

FDC2214EVM Specifications

FDC2214EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Demonstration Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Capacitive Touch Sensors

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is -.

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed I2C

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 2.7 V ~ 3.6 V.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Touch, Capacitive.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is 2 Buttons/Keys.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed FDC2214

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed FDC2214

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$45.04
US$45.04
10
US$42.79
US$427.93
100
US$40.54
US$4 054.05
500
US$38.29
US$19 144.15
1000
US$36.04
US$36 036.00
Top