LMT01EVM

Mfr. #: LMT01EVM
制造商: Texas Instruments
描述: EVAL BOARD FOR LMT01
生命周期: 制造商新产品。
数据表: LMT01EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMT01EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±0.5°C Interface: Digital Voltage Supply Range: 5V, USB Temperature Sensing range of -50°C ~ 150°C Included item: Board. IC package type: LMT01 Maximum operating temperature of + 150 C Minimum operating temperature: - 50 C This product operates at a 5.5 V supply voltage for reliable performance. This tool is designed for the LMT01. 1-Wire interface type

LMT01EVM Image

LMT01EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMT01EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity ±0.5°C
  • Interface Digital
  • Voltage-Supply 5V, USB
  • Sensor-Type Temperature
  • Sensing-Range -50°C ~ 150°C
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part LMT01
  • Maximum-Operating-Temperature + 150 C
  • Minimum-Operating-Temperature - 50 C
  • Operating-Supply-Voltage 5.5 V
  • Tool-Is-For-Evaluation-Of LMT01
  • Interface-Type 1-Wire

LMT01EVM

LMT01EVM Specifications

LMT01EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Temperature Sensors

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is ±0.5°C.

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed Digital

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 5V, USB.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Temperature.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -50°C ~ 150°C.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed LMT01

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 150 C.

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 50 C.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5.5 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is LMT01.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is 1-Wire.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$30.00
US$30.00
10
US$28.50
US$285.00
100
US$27.00
US$2 700.00
500
US$25.50
US$12 750.00
1000
US$24.00
US$24 000.00
Top