| Mfr. #: | LMT90EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Sensor Development Tools Temperature Sensor Development Tools LMT90EVM Temp Sensor EVM |
| 生命周期: | 制造商新产品。 |
| 数据表: | LMT90EVM 数据表 |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±3°C Interface: Analog Voltage Supply Range: 4.5 V ~ 10 V Temperature Sensing range of -40°C ~ 125°C Included item: Board. IC package type: LMT90 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 4.5 V to 10 V supply voltage for reliable performance. This tool is designed for the LMT90.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMT90EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Temperature Sensors.
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: At what frequency does the Sensitivity?
Q: The product Sensitivity is ±3°C.
A: At what frequency does the Interface?
Q: The product Interface is Analog.
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 4.5 V ~ 10 V.
A: What is the Sensor-Type of the product?
Q: The Sensor-Type of the product is Temperature.
A: Is the cutoff frequency of the product Sensing-Range?
Q: Yes, the product's Sensing-Range is indeed -40°C ~ 125°C
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is LMT90.
A: Is the cutoff frequency of the product Maximum-Operating-Temperature?
Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C
A: Is the cutoff frequency of the product Minimum-Operating-Temperature?
Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 4.5 V to 10 V.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed LMT90