LP8728EVM Overview

Product belongs to the LP8728 series. The DC/DC, Step Down is the Main-Purpose. 4.5 V ~ 5.5 V voltage input This product features 'Frequency-Switching' at 3.3MHz for optimal performance. Output voltage: 1.25V, 1.8V, 2.65V, 3.3V Buck regulator topology - Included item: Board. IC package type: LP8728 Board type: Fully Populated. The product has 4, Non-Isolated outputs.

LP8728EVM Image

LP8728EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP8728EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series LP8728
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 4.5 V ~ 5.5 V
  • Frequency-Switching 3.3MHz
  • Current-Output -
  • Voltage-Output 1.25V, 1.8V, 2.65V, 3.3V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part LP8728
  • Board-Type Fully Populated
  • Outputs-and-Type 4, Non-Isolated

LP8728EVM

LP8728EVM Specifications

LP8728EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is LP8728.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is DC/DC, Step Down.

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed 4.5 V ~ 5.5 V

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 3.3MHz

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is 1.25V, 1.8V, 2.65V, 3.3V.

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Buck

  • A: What is the Power-Output of the product?

    Q: The Power-Output of the product is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is LP8728.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 4, Non-Isolated.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$172.52
US$172.52
10
US$163.89
US$1 638.89
100
US$155.26
US$15 526.35
500
US$146.64
US$73 318.90
1000
US$138.01
US$138 012.00
Top