OPA1S2385EVM

Mfr. #: OPA1S2385EVM
制造商: Texas Instruments
描述: MODULE EVAL FOR OPA1S2385
生命周期: 制造商新产品。
数据表: OPA1S2385EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
OPA1S2385EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Operational Amplifiers This product is designed OPA1S2385 amplifier. Operational temperature range: -40°C ~ 85°C Output-Type: Single-Ended, Rail-to-Rail Voltage supply range: 2.7 V ~ 5.5 V, ±1.35 V ~ 2.75 V The 250MHz The 150 V/μs. Current-Output-Channel is 100mA The amplifier is of Transimpedance type. Included item: Board. IC package type: OPA1S2385 Board type: Fully Populated. The product has 2 - Dual channel per IC. This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the OPA1S2385. SMA interface type

OPA1S2385EVM Image

OPA1S2385EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

OPA1S2385EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Modules
  • Type Operational Amplifiers
  • For-Use-With OPA1S2385
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Single-Ended, Rail-to-Rail
  • Voltage-Supply-Single-Dual 2.7 V ~ 5.5 V, ±1.35 V ~ 2.75 V
  • -3db-Bandwidth 250MHz
  • Slew-Rate 150 V/μs
  • Current-Output-Channel 100mA
  • Amplifier-Type Transimpedance
  • Supplied-Contents Board
  • Utilized-IC-Part OPA1S2385
  • Board-Type Fully Populated
  • Channels-per-IC 2 - Dual
  • Current-Supply-Main-IC 9.8mA
  • Operating-Supply-Voltage 2.7 V to 5.5 V
  • Tool-Is-For-Evaluation-Of OPA1S2385
  • Interface-Type SMA

OPA1S2385EVM

OPA1S2385EVM Specifications

OPA1S2385EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Operational Amplifiers

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is OPA1S2385.

  • A: At what frequency does the Operating-Temperature?

    Q: The product Operating-Temperature is -40°C ~ 85°C.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed Single-Ended, Rail-to-Rail

  • A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?

    Q: Yes, the product's Voltage-Supply-Single-Dual is indeed 2.7 V ~ 5.5 V, ±1.35 V ~ 2.75 V

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 250MHz.

  • A: What is the Slew-Rate of the product?

    Q: The Slew-Rate of the product is 150 V/μs.

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is 100mA.

  • A: Is the cutoff frequency of the product Amplifier-Type?

    Q: Yes, the product's Amplifier-Type is indeed Transimpedance

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is OPA1S2385.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: Is the cutoff frequency of the product Channels-per-IC?

    Q: Yes, the product's Channels-per-IC is indeed 2 - Dual

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.7 V to 5.5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is OPA1S2385.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$56.74
US$56.74
10
US$53.91
US$539.08
100
US$51.07
US$5 107.05
500
US$48.23
US$24 116.65
1000
US$45.40
US$45 396.00
Top