OPT3001EVM

Mfr. #: OPT3001EVM
制造商: Texas Instruments
描述: Sensor Development Tools Optical Sensor Development Tools Ambient Light Sensor Eval Board
生命周期: 制造商新产品。
数据表: OPT3001EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
OPT3001EVM Overview

Product belongs to the OPT3001 series. This product is categorized as Evaluation Modules Type: Ambient Light Sensors Bulk is the packaging method for this product Sensitivity: 550nm Interface: I2C Voltage Supply Range: 1.6 V ~ 3.6 V Light, Ambient Sensing range of - Included item: 2 Boards, Cable. IC package type: OPT3001 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product operates at a 1.6 V to 3.6 V supply voltage for reliable performance. This product is an -. This tool is designed for the OPT3001. I2C USB interface type Our product measures - in dimensions for compact and convenient use.

OPT3001EVM Image

OPT3001EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

OPT3001EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series OPT3001
  • Product Evaluation Modules
  • Type Ambient Light Sensors
  • Packaging Bulk
  • Sensitivity 550nm
  • Interface I2C
  • Voltage-Supply 1.6 V ~ 3.6 V
  • Sensor-Type Light, Ambient
  • Sensing-Range -
  • Supplied-Contents 2 Boards, Cable
  • Embedded -
  • Utilized-IC-Part OPT3001
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 1.6 V to 3.6 V
  • Description-Function -
  • Tool-Is-For-Evaluation-Of OPT3001
  • Interface-Type I2C USB
  • Dimensions -

OPT3001EVM

OPT3001EVM Specifications

OPT3001EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is OPT3001.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Ambient Light Sensors.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is 550nm.

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 1.6 V ~ 3.6 V.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Light, Ambient.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is 2 Boards, Cable.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is OPT3001.

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 85 C

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.6 V to 3.6 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is -.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is OPT3001.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C USB.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed -

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$28.95
US$28.95
10
US$27.50
US$275.03
100
US$26.06
US$2 605.50
500
US$24.61
US$12 303.75
1000
US$23.16
US$23 160.00
Top