PCM4104EVM

Mfr. #: PCM4104EVM
制造商: Texas Instruments
描述: EVALUATION MODULE FOR PCM4104
生命周期: 制造商新产品。
数据表: PCM4104EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PCM4104EVM Overview

Type: Audio ADC Bulk is the packaging method for this product This product operates at a 5 V supply voltage for reliable performance. This tool is designed for the PCM4104.

PCM4104EVM Image

PCM4104EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM4104EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Type Audio ADC
  • Packaging Bulk
  • Operating-Supply-Voltage 5 V
  • Tool-Is-For-Evaluation-Of PCM4104

PCM4104EVM

PCM4104EVM Specifications

PCM4104EVM FAQ
  • A: At what frequency does the Type?

    Q: The product Type is Audio ADC.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed PCM4104

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$38.25
US$38.25
10
US$36.34
US$363.38
100
US$34.42
US$3 442.50
500
US$32.51
US$16 256.25
1000
US$30.60
US$30 600.00
Top