TAS5630PHD2EVM

Mfr. #: TAS5630PHD2EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR TAS5630PHD2
生命周期: 制造商新产品。
数据表: TAS5630PHD2EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS5630PHD2EVM Overview

Product belongs to the PurePath HD series. This product is categorized as Evaluation Modules Type: Audio Amplifiers Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 25 V ~ 50 V Maximum Output Power of 607W x 1 @ 2 Ohm; 318W x 2 @ 4 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TAS5630 Board type: Fully Populated. This product operates at a 25 V to 50 V supply voltage for reliable performance. This tool is designed for the TAS5630PHD. 16 A is 92 nA. Our product measures 140 mm x 90 mm x 55 mm in dimensions for compact and convenient use.

TAS5630PHD2EVM Image

TAS5630PHD2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5630PHD2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series PurePath HD
  • Product Evaluation Modules
  • Type Audio Amplifiers
  • Packaging Bulk
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 25 V ~ 50 V
  • Max-Output-Power-x-Channels-Load 607W x 1 @ 2 Ohm; 318W x 2 @ 4 Ohm
  • Amplifier-Type Class D
  • Supplied-Contents Board
  • Utilized-IC-Part TAS5630
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 25 V to 50 V
  • Tool-Is-For-Evaluation-Of TAS5630PHD
  • Operating-Supply-Current 16 A
  • Dimensions 140 mm x 90 mm x 55 mm

TAS5630PHD2EVM

TAS5630PHD2EVM Specifications

TAS5630PHD2EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is PurePath HD.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifiers

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed 2-Channel (Stereo)

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 25 V ~ 50 V

  • A: What is the Max-Output-Power-x-Channels-Load of the product?

    Q: The Max-Output-Power-x-Channels-Load of the product is 607W x 1 @ 2 Ohm; 318W x 2 @ 4 Ohm.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Class D.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TAS5630.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 25 V to 50 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TAS5630PHD.

  • A: What is the Operating-Supply-Current of the product?

    Q: The Operating-Supply-Current of the product is 16 A.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 140 mm x 90 mm x 55 mm.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$598.50
US$598.50
10
US$568.58
US$5 685.75
100
US$538.65
US$53 865.00
500
US$508.72
US$254 362.50
1000
US$478.80
US$478 800.00
Top