THS4012EVM

Mfr. #: THS4012EVM
制造商: Texas Instruments
描述: EVAL MOD FOR THS4012
生命周期: 制造商新产品。
数据表: THS4012EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS4012EVM Overview

Product belongs to the - series. Operational temperature range: 0°C ~ 70°C Output-Type: Single-Ended Voltage supply range: 9 V ~ 32 V, ±4.5 V ~ 16 V The 290MHz The 310 V/μs. Current-Output-Channel is 110mA The amplifier is of Voltage Feedback type. Included item: Board. IC package type: THS4012 Board type: Fully Populated. The product has 1 - Single channel per IC.

THS4012EVM Image

THS4012EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4012EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Operating-Temperature 0°C ~ 70°C
  • Output-Type Single-Ended
  • Voltage-Supply-Single-Dual 9 V ~ 32 V, ±4.5 V ~ 16 V
  • -3db-Bandwidth 290MHz
  • Slew-Rate 310 V/μs
  • Current-Output-Channel 110mA
  • Amplifier-Type Voltage Feedback
  • Supplied-Contents Board
  • Utilized-IC-Part THS4012
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 7.8mA

THS4012EVM

THS4012EVM Specifications

THS4012EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed 0°C ~ 70°C

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed Single-Ended

  • A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?

    Q: Yes, the product's Voltage-Supply-Single-Dual is indeed 9 V ~ 32 V, ±4.5 V ~ 16 V

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 290MHz.

  • A: Is the cutoff frequency of the product Slew-Rate?

    Q: Yes, the product's Slew-Rate is indeed 310 V/μs

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is 110mA.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Voltage Feedback.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed THS4012

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Channels-per-IC of the product?

    Q: The Channels-per-IC of the product is 1 - Single.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$0.00
US$0.00
10
US$0.00
US$0.00
100
US$0.00
US$0.00
500
US$0.00
US$0.00
1000
US$0.00
US$0.00
Top