THS4151EVM

Mfr. #: THS4151EVM
制造商: Texas Instruments
描述: EVAL MOD FOR THS4151
生命周期: 制造商新产品。
数据表: THS4151EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS4151EVM Overview

Product belongs to the - series. Operational temperature range: 0°C ~ 70°C Output-Type: Differential Voltage supply range: 4 V ~ 33 V, ±2 V ~ 16.5 V The 150MHz The 650 V/μs. Current-Output-Channel is 85mA The amplifier is of Differential type. Included item: Board. IC package type: THS4151 Board type: Fully Populated. The product has 1 - Single channel per IC.

THS4151EVM Image

THS4151EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4151EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Operating-Temperature 0°C ~ 70°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 4 V ~ 33 V, ±2 V ~ 16.5 V
  • -3db-Bandwidth 150MHz
  • Slew-Rate 650 V/μs
  • Current-Output-Channel 85mA
  • Amplifier-Type Differential
  • Supplied-Contents Board
  • Utilized-IC-Part THS4151
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 17.5mA

THS4151EVM

THS4151EVM Specifications

THS4151EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Operating-Temperature of the product?

    Q: The Operating-Temperature of the product is 0°C ~ 70°C.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed Differential

  • A: What is the Voltage-Supply-Single-Dual of the product?

    Q: The Voltage-Supply-Single-Dual of the product is 4 V ~ 33 V, ±2 V ~ 16.5 V.

  • A: Is the cutoff frequency of the product -3db-Bandwidth?

    Q: Yes, the product's -3db-Bandwidth is indeed 150MHz

  • A: What is the Slew-Rate of the product?

    Q: The Slew-Rate of the product is 650 V/μs.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 85mA.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Differential.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed THS4151

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Channels-per-IC of the product?

    Q: The Channels-per-IC of the product is 1 - Single.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$96.70
US$96.70
10
US$91.87
US$918.70
100
US$87.03
US$8 703.45
500
US$82.20
US$41 099.65
1000
US$77.36
US$77 364.00
Top