TLC3548EVM

Mfr. #: TLC3548EVM
制造商: Texas Instruments
描述: EVALUATION MODULE FOR TLC3548
生命周期: 制造商新产品。
数据表: TLC3548EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLC3548EVM Overview

Product belongs to the - series. This product's 200k. Data-Interface: Serial 14 bits 1 units Input range: 0 ~ 5 V Included item: Board. IC package type: TLC3548

TLC3548EVM Image

TLC3548EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLC3548EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 200k
  • Data-Interface Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5 V
  • Supplied-Contents Board
  • Utilized-IC-Part TLC3548
  • Power-Typ-Conditions -

TLC3548EVM

TLC3548EVM Specifications

TLC3548EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 200k.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 14.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 0 ~ 5 V.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TLC3548

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$79.24
US$79.24
10
US$75.28
US$752.82
100
US$71.32
US$7 131.99
500
US$67.36
US$33 678.85
1000
US$63.40
US$63 395.50
Top