TMP006EVM

Mfr. #: TMP006EVM
制造商: Texas Instruments
描述: Sensor Development Tools Temperature Sensor Development Tools TMP006 Eval Mod
生命周期: 制造商新产品。
数据表: TMP006EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP006EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: - Interface: I2C, SPI, USB Voltage Supply Range: 2.7 V ~ 5.5 V Temperature Sensing range of - Included item: Board, Cables. IC package type: TMP006 This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the TMP006. USB interface type

TMP006EVM Image

TMP006EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP006EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity -
  • Interface I2C, SPI, USB
  • Voltage-Supply 2.7 V ~ 5.5 V
  • Sensor-Type Temperature
  • Sensing-Range -
  • Supplied-Contents Board, Cables
  • Embedded No
  • Utilized-IC-Part TMP006
  • Operating-Supply-Voltage 2.7 V to 5.5 V
  • Tool-Is-For-Evaluation-Of TMP006
  • Interface-Type USB

TMP006EVM

TMP006EVM Specifications

TMP006EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensors.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed -

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed I2C, SPI, USB

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 2.7 V ~ 5.5 V.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Temperature.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board, Cables.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TMP006.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.7 V to 5.5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TMP006.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$31.40
US$31.40
10
US$29.83
US$298.25
100
US$28.26
US$2 825.55
500
US$26.69
US$13 342.90
1000
US$25.12
US$25 116.00
Top