TMP100EVM

Mfr. #: TMP100EVM
制造商: Texas Instruments
描述: EVALUATION MODULE FOR TMP100
生命周期: 制造商新产品。
数据表: TMP100EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP100EVM Overview

Product belongs to the - series. Sensitivity: ±0.5°C Interface: I2C, SMBus Voltage Supply Range: 2.7 V ~ 5.5 V Temperature Sensing range of -55°C ~ 125°C Included item: Board. IC package type: TMP100

TMP100EVM Image

TMP100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP100EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Sensitivity ±0.5°C
  • Interface I2C, SMBus
  • Voltage-Supply 2.7 V ~ 5.5 V
  • Sensor-Type Temperature
  • Sensing-Range -55°C ~ 125°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part TMP100

TMP100EVM

TMP100EVM Specifications

TMP100EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±0.5°C.

  • A: What is the Interface of the product?

    Q: The Interface of the product is I2C, SMBus.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 2.7 V ~ 5.5 V.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -55°C ~ 125°C.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TMP100

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$96.70
US$96.70
10
US$91.87
US$918.70
100
US$87.03
US$8 703.45
500
US$82.20
US$41 099.65
1000
US$77.36
US$77 364.00
Top