TMP103EVM

Mfr. #: TMP103EVM
制造商: Texas Instruments
描述: Sensor Development Tools Temperature Sensor Development Tools TMP103 Eval Mod
生命周期: 制造商新产品。
数据表: TMP103EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP103EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±1°C Interface: I2C, USB Voltage Supply Range: 5V, USB Temperature Sensing range of -40°C ~ 125°C Included item: Board, Cables. IC package type: TMP103 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 1.4 V to 3.6 V supply voltage for reliable performance. This tool is designed for the TMP103. I2C SMBus interface type

TMP103EVM Image

TMP103EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP103EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity ±1°C
  • Interface I2C, USB
  • Voltage-Supply 5V, USB
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents Board, Cables
  • Embedded No
  • Utilized-IC-Part TMP103
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 1.4 V to 3.6 V
  • Tool-Is-For-Evaluation-Of TMP103
  • Interface-Type I2C SMBus

TMP103EVM

TMP103EVM Specifications

TMP103EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensors.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is ±1°C.

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C, USB.

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 5V, USB

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Temperature.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed -40°C ~ 125°C

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board, Cables.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TMP103

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.4 V to 3.6 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TMP103.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2C SMBus

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top