TMP104EVM

Mfr. #: TMP104EVM
制造商: Texas Instruments
描述: Sensor Development Tools Temperature Sensor Development Tools TMP104 Eval Mod
生命周期: 制造商新产品。
数据表: TMP104EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP104EVM Overview

Product belongs to the SMAARTWIRE series. Sensitivity: ±3°C Interface: - Voltage Supply Range: - Temperature Sensing range of -40°C ~ 125°C Included item: 2 Boards, Cables. IC package type: TMP104

TMP104EVM Image

TMP104EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP104EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series SMAARTWIRE
  • Sensitivity ±3°C
  • Interface -
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents 2 Boards, Cables
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part TMP104

TMP104EVM

TMP104EVM Specifications

TMP104EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is SMAARTWIRE.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed ±3°C

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed -

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is -.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Temperature.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed -40°C ~ 125°C

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed 2 Boards, Cables

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP104.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$112.50
US$112.50
10
US$106.88
US$1 068.75
100
US$101.25
US$10 125.00
500
US$95.62
US$47 812.50
1000
US$90.00
US$90 000.00
Top