| Mfr. #: | TMP108EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Sensor Development Tools Temperature Sensor Development Tools TMP108 EVAL MOD |
| 生命周期: | 制造商新产品。 |
| 数据表: | TMP108EVM 数据表 |


Product belongs to the - series. This product is categorized as Evaluation Boards Sensitivity: ±1°C Interface: I2C, SMBus, USB Voltage Supply Range: 1.4 V ~ 3.6 V Temperature Sensing range of -40°C ~ 125°C Included item: 2 Boards, Cables. IC package type: TMP108 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TMP108. I2C USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP108EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: Is the cutoff frequency of the product Sensitivity?
Q: Yes, the product's Sensitivity is indeed ±1°C
A: Is the cutoff frequency of the product Interface?
Q: Yes, the product's Interface is indeed I2C, SMBus, USB
A: Is the cutoff frequency of the product Voltage-Supply?
Q: Yes, the product's Voltage-Supply is indeed 1.4 V ~ 3.6 V
A: At what frequency does the Sensor-Type?
Q: The product Sensor-Type is Temperature.
A: At what frequency does the Sensing-Range?
Q: The product Sensing-Range is -40°C ~ 125°C.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is 2 Boards, Cables.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is TMP108.
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 125 C.
A: At what frequency does the Minimum-Operating-Temperature?
Q: The product Minimum-Operating-Temperature is - 40 C.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 1.8 V 3.3 V.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is TMP108.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is I2C USB.