TMP708EVM

Mfr. #: TMP708EVM
制造商: Texas Instruments
描述: Sensor Development Tools Temperature Sensor Development Tools TMP708 Eval Mod
生命周期: 制造商新产品。
数据表: TMP708EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP708EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Temperature Sensors Sensitivity: ±3°C Interface: Analog Voltage Supply Range: 2.7 V ~ 5.5 V Thermostat Sensing range of 0°C ~ 125°C Included item: Board. IC package type: TMP708 Maximum operating temperature of + 125 C This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the TMP708.

TMP708EVM Image

TMP708EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP708EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Boards
  • Type Temperature Sensors
  • Sensitivity ±3°C
  • Interface Analog
  • Voltage-Supply 2.7 V ~ 5.5 V
  • Sensor-Type Thermostat
  • Sensing-Range 0°C ~ 125°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part TMP708
  • Maximum-Operating-Temperature + 125 C
  • Operating-Supply-Voltage 2.7 V to 5.5 V
  • Tool-Is-For-Evaluation-Of TMP708

TMP708EVM

TMP708EVM Specifications

TMP708EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Temperature Sensors.

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is ±3°C.

  • A: What is the Interface of the product?

    Q: The Interface of the product is Analog.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 2.7 V ~ 5.5 V.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Thermostat.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is 0°C ~ 125°C.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP708.

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 125 C.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.7 V to 5.5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TMP708.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top