| Mfr. #: | TMP709EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Sensor Development Tools Temperature Sensor Development Tools TMP709 Eval Mod |
| 生命周期: | 制造商新产品。 |
| 数据表: | TMP709EVM 数据表 |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Temperature Sensors Sensitivity: ±3°C Interface: Analog Voltage Supply Range: 2.7 V ~ 5.5 V Thermostat Sensing range of 0°C ~ 125°C Included item: Board. IC package type: TMP709 Maximum operating temperature of + 125 C This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the TMP709.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP709EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: What is the Type of the product?
Q: The Type of the product is Temperature Sensors.
A: What is the Sensitivity of the product?
Q: The Sensitivity of the product is ±3°C.
A: Is the cutoff frequency of the product Interface?
Q: Yes, the product's Interface is indeed Analog
A: Is the cutoff frequency of the product Voltage-Supply?
Q: Yes, the product's Voltage-Supply is indeed 2.7 V ~ 5.5 V
A: What is the Sensor-Type of the product?
Q: The Sensor-Type of the product is Thermostat.
A: Is the cutoff frequency of the product Sensing-Range?
Q: Yes, the product's Sensing-Range is indeed 0°C ~ 125°C
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is TMP709.
A: Is the cutoff frequency of the product Maximum-Operating-Temperature?
Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 2.7 V to 5.5 V
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is TMP709.