| Mfr. #: | TPA2000D4EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | EVAL MOD FOR TPA2000D4 |
| 生命周期: | 制造商新产品。 |
| 数据表: | TPA2000D4EVM 数据表 |


Product belongs to the - series. Type: Audio Amplifiers Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) with Stereo Headphones Voltage Supply Range: 2.7 V ~ 5.5 V Maximum Output Power of 2W x 2 @ 4 Ohm; 90mW x 2 @ 32 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TPA2000D4 Board type: Fully Populated. This product operates at a 5 V to 15 V supply voltage for reliable performance. This tool is designed for the TPA2000D4.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA2000D4EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: What is the Type of the product?
Q: The Type of the product is Audio Amplifiers.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: What is the Output-Type of the product?
Q: The Output-Type of the product is 2-Channel (Stereo) with Stereo Headphones.
A: At what frequency does the Voltage-Supply?
Q: The product Voltage-Supply is 2.7 V ~ 5.5 V.
A: At what frequency does the Max-Output-Power-x-Channels-Load?
Q: The product Max-Output-Power-x-Channels-Load is 2W x 2 @ 4 Ohm; 90mW x 2 @ 32 Ohm.
A: At what frequency does the Amplifier-Type?
Q: The product Amplifier-Type is Class D.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TPA2000D4
A: Is the cutoff frequency of the product Board-Type?
Q: Yes, the product's Board-Type is indeed Fully Populated
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 5 V to 15 V.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is TPA2000D4.