TPS2113EVM

Mfr. #: TPS2113EVM
制造商: Texas Instruments
描述: EVAL MOD FOR TPS2113
生命周期: 制造商新产品。
数据表: TPS2113EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2113EVM Overview

Product belongs to the - series. The Power Management, Power Distribution Switch (Load Switch) is the Main-Purpose. Primary-Attributes: - IC package type: TPS2113

TPS2113EVM Image

TPS2113EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2113EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Power Management, Power Distribution Switch (Load Switch)
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TPS2113

TPS2113EVM

TPS2113EVM Specifications

TPS2113EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Power Distribution Switch (Load Switch)

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPS2113.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top