| Mfr. #: | TPS2390EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | EVAL MOD FOR TPS2390 |
| 生命周期: | 制造商新产品。 |
| 数据表: | TPS2390EVM 数据表 |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers The Power Management, Hot Swap Controller is the Main-Purpose. Primary-Attributes: - IC package type: TPS2390 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This tool is designed for the TPS2390. Our product measures 81.9 mm x 56.8 mm in dimensions for compact and convenient use. Input Voltage Range: - 48 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2390EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: What is the Type of the product?
Q: The Type of the product is Hot Swap Voltage Controllers.
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Power Management, Hot Swap Controller.
A: What is the Primary-Attributes of the product?
Q: The Primary-Attributes of the product is -.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TPS2390
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 85 C.
A: What is the Minimum-Operating-Temperature of the product?
Q: The Minimum-Operating-Temperature of the product is - 40 C.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is TPS2390.
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 81.9 mm x 56.8 mm.
A: Is the cutoff frequency of the product Input-Voltage?
Q: Yes, the product's Input-Voltage is indeed - 48 V