| Mfr. #: | TPS2393EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | EVAL MODULE FOR TPS2393 |
| 生命周期: | 制造商新产品。 |
| 数据表: | TPS2393EVM 数据表 |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers The Power Management, Hot Swap Controller is the Main-Purpose. Primary-Attributes: - IC package type: TPS2393 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This tool is designed for the TPS2393. Our product measures 119.6 mm x 91.4 mm in dimensions for compact and convenient use. Input Voltage Range: - 48 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2393EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: What is the Type of the product?
Q: The Type of the product is Hot Swap Voltage Controllers.
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Power Management, Hot Swap Controller.
A: Is the cutoff frequency of the product Primary-Attributes?
Q: Yes, the product's Primary-Attributes is indeed -
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is TPS2393.
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 85 C.
A: At what frequency does the Minimum-Operating-Temperature?
Q: The product Minimum-Operating-Temperature is - 40 C.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS2393
A: At what frequency does the Dimensions?
Q: The product Dimensions is 119.6 mm x 91.4 mm.
A: What is the Input-Voltage of the product?
Q: The Input-Voltage of the product is - 48 V.