TPS2412EVM

Mfr. #: TPS2412EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR TPS2412
生命周期: 制造商新产品。
数据表: TPS2412EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2412EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers Bulk is the packaging method for this product The Power Management, ORing Controller / Load Share is the Main-Purpose. Primary-Attributes: N+1 Power Supplies IC package type: TPS2412 This tool is designed for the TPS2412. Our product measures 94 mm x 76.2 mm in dimensions for compact and convenient use. Input Voltage Range: 1 V to 5 V

TPS2412EVM Image

TPS2412EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2412EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Hot Swap Voltage Controllers
  • Packaging Bulk
  • Main-Purpose Power Management, ORing Controller / Load Share
  • Primary-Attributes N+1 Power Supplies
  • Embedded No
  • Utilized-IC-Part TPS2412
  • Tool-Is-For-Evaluation-Of TPS2412
  • Dimensions 94 mm x 76.2 mm
  • Input-Voltage 1 V to 5 V

TPS2412EVM

TPS2412EVM Specifications

TPS2412EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Hot Swap Voltage Controllers

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, ORing Controller / Load Share.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed N+1 Power Supplies

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS2412

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS2412

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 94 mm x 76.2 mm.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 1 V to 5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$56.74
US$56.74
10
US$53.91
US$539.08
100
US$51.07
US$5 107.05
500
US$48.23
US$24 116.65
1000
US$45.40
US$45 396.00
Top