TPS40180EVM

Mfr. #: TPS40180EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR TPS40180
生命周期: 制造商新产品。
数据表: TPS40180EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS40180EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Switching Controllers Bulk is the packaging method for this product The DC/DC, Step Down is the Main-Purpose. 10.8 V ~ 13.2 V voltage input This product features 'Frequency-Switching' at 285kHz for optimal performance. Output voltage: 1.5V Buck regulator topology - Included item: Board. IC package type: TPS40180 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 1.5 V This tool is designed for the TPS40180. Input Voltage Range: 12 V

TPS40180EVM Image

TPS40180EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS40180EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Switching Controllers
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 10.8 V ~ 13.2 V
  • Frequency-Switching 285kHz
  • Current-Output 20A
  • Voltage-Output 1.5V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS40180
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 1.5 V
  • Tool-Is-For-Evaluation-Of TPS40180
  • Input-Voltage 12 V

TPS40180EVM

TPS40180EVM Specifications

TPS40180EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Switching Controllers.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is DC/DC, Step Down.

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed 10.8 V ~ 13.2 V

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 285kHz

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is 1.5V.

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Buck

  • A: What is the Power-Output of the product?

    Q: The Power-Output of the product is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPS40180.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: At what frequency does the Outputs-and-Type?

    Q: The product Outputs-and-Type is 1, Non-Isolated.

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 1.5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TPS40180.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 12 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$76.10
US$76.10
10
US$72.29
US$722.90
100
US$68.49
US$6 848.55
500
US$64.68
US$32 340.40
1000
US$60.88
US$60 876.00
Top