TPS54873EVM

Mfr. #: TPS54873EVM
制造商: Texas Instruments
描述: EVAL MOD FOR TPS54873
生命周期: 制造商新产品。
数据表: TPS54873EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS54873EVM Overview

Product belongs to the SWIFT series. This product is categorized as Evaluation Boards Type: Voltage Regulators - Switching Regulators Bulk is the packaging method for this product The DC/DC, Step Down is the Main-Purpose. 4 V ~ 6 V voltage input This product features 'Frequency-Switching' at 700kHz for optimal performance. Output voltage: 3.3V Buck regulator topology - Included item: Board. IC package type: TPS54873 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 3.3 V This tool is designed for the TPS54873. Our product measures 76.2 mm x 76.2 mm in dimensions for compact and convenient use. Input Voltage Range: 5 V

TPS54873EVM Image

TPS54873EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54873EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series SWIFT
  • Product Evaluation Boards
  • Type Voltage Regulators - Switching Regulators
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 4 V ~ 6 V
  • Frequency-Switching 700kHz
  • Current-Output 8A
  • Voltage-Output 3.3V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS54873
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TPS54873
  • Dimensions 76.2 mm x 76.2 mm
  • Input-Voltage 5 V

TPS54873EVM

TPS54873EVM Specifications

TPS54873EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is SWIFT.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is DC/DC, Step Down.

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 4 V ~ 6 V.

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 700kHz

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is 3.3V.

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Buck

  • A: Is the cutoff frequency of the product Power-Output?

    Q: Yes, the product's Power-Output is indeed -

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS54873

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 1, Non-Isolated

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TPS54873.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 76.2 mm x 76.2 mm.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 5 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$11.58
US$11.58
10
US$11.00
US$110.01
100
US$10.42
US$1 042.20
500
US$9.84
US$4 921.50
1000
US$9.26
US$9 264.00
Top