TRF2436EVM

Mfr. #: TRF2436EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR TRF2436
生命周期: 制造商新产品。
数据表: TRF2436EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF2436EVM Overview

Compatible with TRF2436. Product belongs to the - series. Type: Front End This product's 2.4GHz ~ 2.5GHz, 4.9GHz ~ 5.9GHz range is 0Hz to 2.2GHz. Included item: Board.

TRF2436EVM Image

TRF2436EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF2436EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF2436
  • Series -
  • Type Front End
  • Frequency 2.4GHz ~ 2.5GHz, 4.9GHz ~ 5.9GHz
  • Supplied-Contents Board

TRF2436EVM

TRF2436EVM Specifications

TRF2436EVM FAQ
  • A: Is the cutoff frequency of the product For-Use-With-Related-Products?

    Q: Yes, the product's For-Use-With-Related-Products is indeed TRF2436

  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Front End

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 2.4GHz ~ 2.5GHz, 4.9GHz ~ 5.9GHz.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$463.52
US$463.52
10
US$440.34
US$4 403.39
100
US$417.16
US$41 716.35
500
US$393.99
US$196 993.90
1000
US$370.81
US$370 812.00
Top