TRF37A32EVM

Mfr. #: TRF37A32EVM
制造商: Texas Instruments
描述: EVAL BOARD FOR TRF37A32
生命周期: 制造商新产品。
数据表: TRF37A32EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37A32EVM Overview

Compatible with TRF37A32. Product belongs to the - series. This product is categorized as Evaluation Boards Type: Mixer This product is designed TRF37x32 amplifier. This product's 400MHz ~ 1.7GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TRF37x32. USB interface type

TRF37A32EVM Image

TRF37A32EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37A32EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF37A32
  • Series -
  • Product Evaluation Boards
  • Type Mixer
  • For-Use-With TRF37x32
  • Frequency 400MHz ~ 1.7GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TRF37x32
  • Interface-Type USB

TRF37A32EVM

TRF37A32EVM Specifications

TRF37A32EVM FAQ
  • A: At what frequency does the For-Use-With-Related-Products?

    Q: The product For-Use-With-Related-Products is TRF37A32.

  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Mixer.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is TRF37x32.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 400MHz ~ 1.7GHz.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TRF37x32.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$298.50
US$298.50
10
US$283.58
US$2 835.75
100
US$268.65
US$26 865.00
500
US$253.72
US$126 862.50
1000
US$238.80
US$238 800.00
Top